目的 为解决灾害现场应急装备快速部署、高稳定性及有效防护需求,设计并研制了一种子母式高压气肋应急手术帐篷,旨在提升其结构力学性能、成型效率及装备防护能力,保障现场应急手术及时顺利开展。方法 设计高压骨架气肋与高压全气肋2种母帐篷结构方案,通过成型试验及室外风载试验验证2种母帐篷结构的力学性能、成型效率及抗风防护能力。同时,针对全气肋帐篷,采用并联充气工艺验证其快速部署性能。结果 全气肋帐篷在力学性能、成型效率等方面更适配应急手术的实际使用需求,使用并联充气工艺,13.8 m×6 m×3.6 m足尺帐篷模型可在15 min内完成成型,撤收时间小于15 min,折展比为42∶1。结论 全气肋帐篷兼具优异的力学性能与快速部署能力,为灾害现场应急帐篷装备的工程应用与性能优化提供支撑。
Abstract
The work aims to design and develop a connected high-pressure air-rib emergency surgical dome tent to improve its structural mechanical performance, erection efficiency, and equipment protection capability, and ensure the timely and smooth implementation of on-site emergency surgeries, so as to address the requirements for rapid deployment, high stability, and effective protection of emergency equipment at disaster sites. Two structural schemes for the main tent were proposed: a high-pressure frame air-rib structure and a high-pressure full air-rib structure. Their mechanical performance, erection efficiency, and wind-resistant protection capability were verified through forming tests and outdoor wind load tests. Meanwhile, a parallel inflation process was adopted for the full air-rib tent to verify its rapid deployment performance. The test results showed that the full air-rib tent was more suitable for the actual usage requirements of emergency surgery in terms of mechanical performance, molding efficiency, etc. With the parallel inflation process, a full-scale tent model with dimensions of 13.8 m×6 m×3.6 m could be fully erected within 15 min, retracted in less than 15 min, and achieved a fold-expansion ratio of 42∶1. The all air-rib tent combines excellent mechanical properties and rapid deployability, providing support for the engineering application and performance optimization of emergency tent equipment at disaster sites.
关键词
高压骨架气肋帐篷 /
高压全气肋帐篷 /
成型试验 /
室外风载试验
Key words
high-pressure frame air-rib tent /
high-pressure full air-rib tent /
forming test /
outdoor wind load test
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 杨艺, 程俊翔. 基于KANO-AHP-FCE混合模型下的模块化救护车设计研究[J]. 包装工程, 2025, 46(16): 575-587.
YANG Y, CHENG J X.Modular Ambulance Design Based on KANO-AHP-FCE Model[J]. Packaging Engineering, 2025, 46(16): 575-587.
[2] 沈琼, 郝晓禹, 杨钟亮. 灾后公共空间的急救帐篷设计[J]. 包装工程, 2014, 35(8): 47-51.
SHEN Q, HAO X Y, YANG Z L.Relief Tent Design of Post-Disaster Public Space[J]. Packaging Engineering, 2014, 35(8): 47-51.
[3] 谭树林, 刘亚军, 孙景工. 应急医学救援方舱医院装备研究进展[J]. 医疗卫生装备, 2011, 32(9): 78-79.
TAN S L, LIU Y J, SUN J G.Research Progress of Emergency Medical Rescue Shelters of Field Hospitals[J]. Chinese Medical Equipment Journal, 2011, 32(9): 78-79.
[4] 陈务军. 膜结构工程设计[M]. 北京: 中国建筑工业出版社, 2005: 67-69.
CHEN W J.Design of Membrane Structure Engineering[M]. Beijing: China Architecture & Building Press, 2005: 67-69.
[5] 李雄彦, 赵润生, 薛素铎. 高压气肋式膜结构研究综述[J]. 建筑结构, 2023, 53(S1): 539-543.
LI X Y, ZHAO R S, XUE S D.Summary of Research on High Pressure Air-Inflated Membrane Structures[J]. Building Structure, 2023, 53(S1): 539-543.
[6] ZHENG L, XU J N, LI F, et al.Analysis of Mechanical Properties of Air-Ribbed Skeleton Membrane Structure[J]. Applied Sciences, 2023, 13(17): 9545.
[7] MA R Q, DING H X, WEI J Z, et al.Model Analysis of Inflated Curved Beam Considering Pressure Follower Force Effect[J]. Thin-Walled Structures, 2023, 189: 110861.
[8] EXARCHOS I, WANG K R, DO B H, et al.Task-Specific Design Optimization and Fabrication for Inflated-Beam Soft Robots with Growable Discrete Joints[C]//2022 International Conference on Robotics and Automation (ICRA). Philadelphia, PA, USA. IEEE, 2022: 7145-7151.
[9] DALKLINT A, WALLIN M, TORTORELLI D.Simultaneous Shape and Topology Optimization of Inflatable Soft Robots[J]. Computer Methods in Applied Mechanics and Engineering, 2024, 420: 116751.
[10] 张福, 刘坚, 朱利伟, 等. 气肋式充气膜结构风荷载作用下结构特性分析及模型试验[J]. 结构工程师, 2024, 40(3): 153-164.
ZHANG F, LIU J, ZHU L W, et al.Structural Behavior Analysis of Gas-Ribbed Inflatable Membrane Structure under Wind Load and Model Test[J]. Structural Engineers, 2024, 40(3): 153-164.
[11] WEI J Z, DING H X, CHAI Y, et al.Quasi-Static Folding and Deployment of Rigidizable Inflatable Beams[J]. International Journal of Solids and Structures, 2021, 232: 111063.
[12] SUN G J, LI Z H, WU J Z, et al.Simulation and Prediction Deployment Behavior of Air-Inflated Fabric Arch Structures[J]. Results in Engineering, 2023, 19: 101270.
[13] LI N, PENG H J, LI F.Instantaneous Optimal Control of Inflatable Folded Structures[J]. Acta Astronautica, 2022, 195: 52-67.
[14] 陈戊荣, 陈兆荣, 苏运升, 等. 充气膜结构病毒检测实验室建造全过程工程实践[C]//2022年全国工程建设行业施工技术交流会论文集(下册). 北京: 《施工技术(中英文)》杂志社, 2022: 820-823.
CHEN W R, CHEN Z R, SU Y S, et al.Whole-process Engineering Practice of Inflatable Membrane Structure for Virus Detection Laboratory Construction[C]//Proceedings of 2022 National Engineering Construction Industry Construction Technology Exchange Conference (Volume 2). Beijing: Construction Technology Magazine, 2022: 820-823.
[15] 秦杰, 李晓雪, 鞠竹, 等. 高压气肋式子母式应急手术帐篷结构设计与性能研究[J]. 建筑结构, 2026, 56(4): 155-161.
QIN J, LI X X, JU Z, et al.Structural Design and Performance Research of Mother-son Type Emergency Surgical Tent with High-pressure Pneumatic Ribs[J]. Building Structure, 2026, 56(4): 155-161.
[16] 国家市场监督管理总局, 国家标准化管理委员会. 救灾帐篷通用技术要求: GB/T 44010—2024[S]. 北京: 中国标准出版社, 2025: 3.
State Administration for Market Regulation, Standardization Administration of the People’s Republic of China. Disaster Relief Tents—General Technical Requirements: GB/T 44010-2024[S]. Beijing: Standards Press of China, 2025: 3.
基金
国家重点研发计划(2023YFC3011903); 中央高校基本科研业务费资助项目(3142020019); 河北省高等学校科学研究项目(ZC2026162)